Excavation, septic systems and custom homes from Billings to BozemanExcavation and dirt work in Reed Point, MT
Call or text (808) 561-7893 Licensed, Insured and Bonded
IP Construction
Excavator carrying a corrugated metal culvert pipe along a dirt mountain road to the crossing, culvert installation
Our Services

Culvert Installation in Reed Point, MT

Culverts · Reed Point, MT

Culverts set to carry water under the road

IP Construction offers culvert installation for driveways and private roads in Reed Point and the country between Billings and Bozeman. A culvert carries the water in a ditch or a draw under the road, so the road stays put. When the pipe is too small or set wrong, water runs over the top or washes out the fill.

A culvert can go in as part of new gravel driveways and roads on rural land. We dig the trench and bed the pipe, then set it to grade and cover it. Culvert installation is one part of our excavation and dirt work around Reed Point. Call or text (808) 561-7893 for a free estimate.

What We Handle

  • Driveway culverts where a driveway crosses a ditch or a draw
  • Culverts under private roads on rural property
  • Trench dug to the depth and line the pipe needs
  • Pipe set on a firm, even bed
  • Pipe set to the slope of the ditch so water runs through
  • Backfill packed firm on both sides of the pipe
  • Cover over the pipe as deep as the pipe maker calls for
  • Free estimate with the quote in writing

Request a Culverts Quote

Tell us about the septic system, foundation, driveway or new home and where the property is. We look at the job and put a free estimate in writing.

How big should a driveway culvert be?

The size comes from the water the culvert has to carry. A culvert at the foot of a long draw carries more water than one under a short roadside ditch. Spring runoff and big storms are the real test.

The road your driveway meets can set the size. Stillwater County's encroachment permit conditions call for a culvert in every driveway approach, unless the county grants a variance. The standard there is 12 inches, and the Road and Bridge Department can require a bigger or smaller pipe. For a private approach to a state highway, the Montana Department of Transportation (MDT) sets an 18-inch minimum.

A pipe that is too small backs water up until it spills over the road. That water can cut the road and wash out the fill around the pipe. The county and MDT can both call for a bigger pipe where the water needs it.

How we handle culvert pipe installation

Every culvert pipe needs a firm, even bed. MDT's road design manual requires bedding for every pipe on state highway work. We dig the trench and set the pipe on that bed at the slope of the ditch. A pipe set too high makes water pool at the inlet, and one set too flat can fill with silt.

Backfill goes in next and gets packed firm on both sides of the pipe. In a Stillwater County right-of-way, the county inspector approves the backfill material. Too little cover on top lets a heavy load crush the pipe, so the cover follows the pipe maker's guide.

The ends matter too. Water leaving a culvert can cut the ditch below it. MDT's road design manual lists protection at the inlet and the outlet as a way to stop erosion. Your written quote spells out how the ends get finished.

Culvert permits for streams and roads around Reed Point

A culvert in a stream that flows year-round needs a 310 permit under Montana law. The local conservation district issues it and reviews the culvert plan before work starts. Fill in a stream can also need a federal permit from the U.S. Army Corps of Engineers. Montana uses one joint application form, and a copy goes to each office involved.

Work in a mapped floodplain can need a floodplain permit from the local floodplain administrator. Stillwater County's floodplain administrator sits in its Environmental Health office. Ponds on a year-round stream fall under the same 310 rules, a topic on our pond construction page.

In Stillwater County, an approach onto a county road needs an encroachment permit through the Road and Bridge Department. A county inspector checks the work when it is done. On a state highway, the approach permit comes from an MDT district office. Each office answers its own permit questions, and we point you to the right one.

Finished culvert outlet with the pipe end set in rock riprap at a drainage ditch, culvert installation Culvert pipe end bedded in crushed rock at the edge of a driveway, culvert installation

Ready to get started?

Call or text for a written quote. We work about 100 miles around Reed Point across Stillwater, Sweet Grass, Yellowstone, Park, Gallatin and Carbon Counties.

(808) 561-7893
How We Work

How a Job With IP Construction Runs

From the first call or text to the finished work, here is how it goes.

1

Call or text

Call or text (808) 561-7893, or send the form. Tell us what the job is and where the land is.

2

We look at the job

We look at the ground and how the machines will reach the work. Show us any plans you have and any buried lines you know of.

3

Your free estimate

Your free estimate lists the work, in writing. When you say yes, the job goes on the schedule.

4

The work

We do the work the quote lists. On a new home, the site work and the foundation come first.

5

Finished work

Holes and trenches get backfilled, and the ground gets graded. Then we go over the finished job with you.

FAQ

Culverts Questions, Answered

Common questions about culverts around Reed Point and the country between Billings and Bozeman. If yours is not here, call or text and ask.

Call (808) 561-7893

How much does culvert installation cost?
The pipe drives much of the price, and a longer or bigger culvert costs more. The depth of the trench and the fill it takes count too. Permit terms can add work, such as a bigger pipe than you planned. We look at the job and put a free estimate in writing.
Why does water run over my driveway instead of through the culvert?
A culvert that is too small or plugged backs water up until it spills over the road. A pipe set above the ditch bottom does the same thing. If the water never reaches the ditch, land grading can turn it there. If the pipe is the problem, we quote a new culvert sized and set for the water.
Who applies for a state highway approach permit?
The landowner does. MDT's approach manual names the owner of the land as the applicant, and the owner signs the form. The application goes to the MDT district office for your area. Work in the highway right-of-way waits for the approved permit.
What kind of culvert pipe goes under a driveway?
The load on the road and the road office's rules decide that. On county roads around Billings, Yellowstone County's road policy accepts corrugated metal pipe and reinforced concrete pipe. It also accepts double-wall plastic pipe with a smooth inside. Your quote names the pipe and its size.
Who takes care of a driveway culvert after it goes in?
Plan on the landowner. MDT's approach manual puts the upkeep of a state highway approach and its structures on the permit holder. Yellowstone County's road policy says the property owner shall maintain its approach. Keep both ends clear of brush and silt, and look at the pipe after spring runoff.
Does someone need to call Montana 811 before the culvert goes in?
Yes, and Montana law puts that call on whoever does the digging. The request goes in at least three business days before the dig, and the marks last 30 days. Private lines past the meter, such as a line to a shop, may not get marked. Show us where those run.
More From IP Construction

Work That Pairs With Culverts

Long new gravel driveway being spread across a dry grass field with a track loader at the far end, gravel driveways

Gravel Driveways

We build gravel driveways and private roads on rural land around Reed Point. A firm base carries the trucks, and a crown with ditches carries the water off.

Learn More
Motor grader shaping a gravel road across open rural grassland with patches of snow, land grading

Land Grading

We grade building pads and yards with our own grader and bulldozer. Each one gets a slope that sends water away from the house.

Learn More
Freshly dug pond basin on a rural horse property with an excavator at the rim, pond construction

Pond Construction

We dig ponds on rural land around Reed Point, from Billings to Bozeman. Each one starts with a look at the soil and where the water will come from.

Learn More
Why Choose IP Construction

Dirt Work and Home Building Between Billings and Bozeman

The dirt work and the house, one company

The septic system, the foundation, the driveway and the cistern can all come from IP Construction. So can the house.

Our own grader and bulldozer

We clear land with our own bulldozer and grade it with our own grader. A building pad gets shaped so water runs away from the house.

A free estimate in writing

We look at the job before we price it. The free estimate comes to you in writing.

Guides and Resources

Culverts Guides

Request a Quote

Get In Touch With IP Construction

Send the form with the job you have in mind and where the land is. You can also call or text (808) 561-7893 for a free estimate.

  • Call or text (808) 561-7893
  • Serving Reed Point, MT and the country between Billings and Bozeman
  • Free estimate in writing · excavation, septic systems and custom homes

Request a Quote

Tell us about the septic system, foundation, driveway or new home and where the property is. We look at the job and put a free estimate in writing.

Call (808) 561-7893