Excavation, septic systems and custom homes from Billings to BozemanExcavation and dirt work in Reed Point, MT
Call or text (808) 561-7893 Licensed, Insured and Bonded
IP Construction
Precast concrete water tanks set side by side in their excavation with green access risers on top, cistern installation
Our Services

Cistern Installation in Reed Point, MT

Cistern Installation · Reed Point, MT

Buried water cisterns, set below the frost line

Cistern installation gives a rural home a place to store its water underground. IP Construction is an excavation contractor serving Reed Point and the country between Billings and Bozeman. We dig the hole for a buried water cistern and set the tank on a firm, level bed. Then we backfill around it and cover it, with the top of the tank below the frost line.

A cistern is the answer when a home has no well, or a well too slow to keep up. The water is delivered by a water hauler, or the slow well fills the tank over time. Drilling a well is work for a licensed water well contractor. If you are building a new home on rural land, the cistern fits into the same site work.

What We Handle

  • Buried water cisterns for rural homes
  • Hole depth set so the top of the tank sits below the frost line
  • A firm, level bed in the bottom of the hole
  • Tanks set and leveled to the tank maker's instructions
  • Backfill around the tank and cover over the top
  • A finished grade that sheds surface water away from the tank
  • Tank sites laid out with room from the septic system and the house
  • Cistern work on the same job as a new septic system or a foundation dig

Request a Cistern Installation Quote

Tell us about the septic system, foundation, driveway or new home and where the property is. We look at the job and put a free estimate in writing.

When Is a Water Cistern the Answer?

The Montana Department of Environmental Quality (DEQ) sets the state's standards for cisterns on home water systems. Those standards allow a cistern filled with water hauled from a public water system. They also allow a cistern fed by a well that falls short of the state's minimum flow.

On a lot under state review, one home's well must show at least 10 gallons per minute for an hour. Lower rates can count if they hold longer, such as 4 gallons per minute for four hours. A slower well may still feed a supplemental cistern, if it pumps enough over a full day.

Wells vary a lot in Stillwater County. The county's 2018 growth policy calls groundwater limited in the northeast part of the county. It puts recorded well flows there at two to twenty-five gallons per minute. To compare the two water sources, see our guide to choosing a cistern or a well.

How an Underground Cistern Tank Goes In

We dig the hole deep enough for the top of the tank to sit below the frost line. The state's cistern standards call for that, and only the access lid may sit higher. If the dig cannot get that deep, the top of the tank must be insulated with high-density insulation board. One inch of that board insulates about as well as one foot of earth.

The bottom of the hole gets a firm, level bed before the tank goes in. Polyethylene (plastic) and fiberglass tanks go in by the maker's instructions, with close attention to bedding and backfill. Precast concrete tanks follow their maker's recommendations too.

The lid and any pipe openings into the tank need a tight seal. Then we backfill around the tank and cover it. The finished grade slopes away from the tank so surface water runs off. Before anyone drinks from a new cistern, it has to be flushed and disinfected.

Placing a Cistern on Rural Land Around Reed Point

On a rural lot around Reed Point, the cistern and the septic system each need their own space. Montana DEQ's cistern standards call for 10 feet between a buried cistern and any foundation. A drainfield needs 50 feet of separation, and a septic tank needs 25 feet. When a lot also needs a new septic system, we lay out both so those distances work.

Montana law puts the call to Montana 811 on whoever does the digging. The request goes in at least three business days before the dig, and the marks last 30 days. Private lines past the meter, like a line to a shop or a well, may not get marked. Point those out to us before the dig.

When a lot goes through state or local review, the cistern plans are part of what gets approved. The office reviewing your lot answers what applies, and we point you there.

Two green plastic water tanks in their excavation being backfilled with sand beside an excavator bucket, cistern installation Row of white plastic water tanks with green lids set in their excavation before backfill, cistern installation

Ready to get started?

Call or text for a written quote. We work about 100 miles around Reed Point across Stillwater, Sweet Grass, Yellowstone, Park, Gallatin and Carbon Counties.

(808) 561-7893
How We Work

How a Job With IP Construction Runs

From the first call or text to the finished work, here is how it goes.

1

Call or text

Call or text (808) 561-7893, or send the form. Tell us what the job is and where the land is.

2

We look at the job

We look at the ground and how the machines will reach the work. Show us any plans you have and any buried lines you know of.

3

Your free estimate

Your free estimate lists the work, in writing. When you say yes, the job goes on the schedule.

4

The work

We do the work the quote lists. On a new home, the site work and the foundation come first.

5

Finished work

Holes and trenches get backfilled, and the ground gets graded. Then we go over the finished job with you.

FAQ

Cistern Installation Questions, Answered

Common questions about cistern installation around Reed Point and the country between Billings and Bozeman. If yours is not here, call or text and ask.

Call (808) 561-7893

How much does cistern installation cost?
The price depends on the size and type of tank and how deep the hole has to go. Rock in the dig, or a site that is hard to reach, adds to the work. We look at the site and put a free estimate in writing, with what is included spelled out. Call or text (808) 561-7893 to set it up.
Does a cistern have to be buried?
Not always. Montana DEQ's standards encourage a tank inside a heated building, where it is easier to check. Any tank above ground has to be in a heated building. Outside, the cistern goes underground, in a tank strong enough for 6 feet of burial.
What size cistern do I need?
That depends on how much water the home uses and how the tank gets refilled. Montana DEQ's standards call for a cistern system sized to meet the home's peak demand. Once the tank size is set, we dig the hole to fit it.
Should a cistern tank be concrete or plastic?
Montana DEQ's standards allow precast concrete, cast-in-place concrete, polyethylene and fiberglass. They note polyethylene can be cost effective for tanks under 1,500 gallons and for remote sites. A precast concrete cistern is usually made to order by a local precast company, with its fittings cast in. Whatever the material, the tank has to be made for drinking water.
Do you drill wells or deliver water?
No. Well drilling goes to a licensed water well contractor, and the water is delivered by a water hauler. Montana DEQ's standards say hauled water must come from a public water system. We install the cistern that holds it.
Who connects the cistern to the house?
A buried cistern usually feeds the house through a pump and a water line. Who handles that depends on the job. Your written quote spells out what is included, so you know before work starts.
More From IP Construction

Work That Pairs With Cistern Installation

New round concrete septic tank with risers set in a fresh excavation, septic system installation

Septic Systems

We install new septic systems for homes and cabins on rural land around Reed Point. The septic tank and the drainfield go in to the approved design.

Learn More
Deep basement excavation with stepped dirt sides and footing forms set at the bottom, foundation excavation

Foundation Excavation

We dig house and shop foundations to the dimensions and depths on your plans. After the concrete is in, we backfill against the walls.

Learn More
Wood framed house with sheathed walls and a new metal roof on a concrete foundation, custom home building

Custom Home Building

We build complete new houses on your land, to your plans. Each build starts with the dirt work and runs through the foundation, framing, siding and roof.

Learn More
Why Choose IP Construction

Dirt Work and Home Building Between Billings and Bozeman

The dirt work and the house, one company

The septic system, the foundation, the driveway and the cistern can all come from IP Construction. So can the house.

Our own grader and bulldozer

We clear land with our own bulldozer and grade it with our own grader. A building pad gets shaped so water runs away from the house.

A free estimate in writing

We look at the job before we price it. The free estimate comes to you in writing.

Guides and Resources

Cistern Installation Guides

Request a Quote

Get In Touch With IP Construction

Send the form with the job you have in mind and where the land is. You can also call or text (808) 561-7893 for a free estimate.

  • Call or text (808) 561-7893
  • Serving Reed Point, MT and the country between Billings and Bozeman
  • Free estimate in writing · excavation, septic systems and custom homes

Request a Quote

Tell us about the septic system, foundation, driveway or new home and where the property is. We look at the job and put a free estimate in writing.

Call (808) 561-7893