Excavation, septic systems and custom homes from Billings to BozemanExcavation and dirt work in Reed Point, MT
Call or text (808) 561-7893 Licensed, Insured and Bonded
IP Construction
Mini excavator leveling a wide septic excavation on a rural lot below the mountains, septic system installation
Our Services

Septic System Installation in Reed Point, MT

Septic Systems · Reed Point, MT

A new septic tank and drainfield for your land

Septic system installation puts a new septic tank and drainfield in the ground where city sewer does not reach. We install new systems for homes and cabins on rural land between Billings and Bozeman. We have put in septic systems for homes around Reed Point.

A new septic system is often one part of a bigger build on bare land. We can plan it with the rest of a custom home build. As an excavation contractor serving Reed Point, we look at the site and put the quote in writing. Call or text (808) 561-7893 for a free estimate.

What We Handle

  • New septic systems for homes and cabins on rural land
  • A new septic system for a shop or a property that needs one
  • Septic tank installation at the size the approved design sets
  • Drainfields built to the type and size on the approved plan
  • The lines that carry wastewater from the tank to the drainfield
  • Septic work timed with the foundation dig on a new build
  • The finished system left open for the county inspection
  • Backfill and a final grade over the system once it passes

Request a Septic Systems Quote

Tell us about the septic system, foundation, driveway or new home and where the property is. We look at the job and put a free estimate in writing.

What Kind of Septic System Does Your Land Need?

Every new septic system starts with a site evaluation where the drainfield will go. NRCS soil surveys give a first look, but Montana's septic standards still call for a field check. A qualified site evaluator measures how much soil sits above groundwater or bedrock. The evaluation also looks at slope, flood risk, usable space and the setbacks.

Those findings shape the system. A standard drainfield uses trenches in the natural soil, fed by gravity or dosed under pressure. Where groundwater or bedrock sits close to the surface, the design may call for a raised sand mound. The state standards size a drainfield by the daily flow and the soil type.

The state standards also call for a replacement area, a second spot held for a future drainfield. Until it is needed, that ground has to stay usable for one.

How Septic Permits Work in Stillwater County

Septic rules start with standards from the Montana Department of Environmental Quality (DEQ). County rules can be stricter, and the county environmental health office issues the septic permit. Sweet Grass County's application, for one, asks for nitrate results from a water sample.

Reed Point sits in Stillwater County, which wants a rural address assignment before a septic application. The lot also needs an approval statement on file. Under 20 acres, not counting county road frontage, that is a Certificate of Subdivision Approval from DEQ. Over 20 acres, the county issues a sanitary approval for a system an authorized consultant designs.

The county's technical rules shape the layout too. The septic tank sits 10 to 50 feet from the foundation unless an engineer's design or the county allows otherwise. No part of the system goes under a building or a driveway unless it is built for the load. Drainfields stay out of swales and low spots where runoff collects.

Septic Tank Installation, Step by Step

Digging waits for the county's go-ahead, a written construction authorization in Stillwater County. Buried utility lines get marked through Montana 811 first, with at least three business days of notice. The septic tank goes in per its maker's install guide, as Montana's septic standards require. The drainfield and the lines from the tank follow the approved plan.

The state standards call for at least 4 feet of cover over sewer lines, unless the designer justifies less. A line that cannot sit that deep gets insulation against freezing. Stillwater County makes septic system installers responsible for meeting every setback. If the site will not allow the design, the installer stops and calls the county.

A final inspection comes before the system is covered. Stillwater County can have a system uncovered if it was covered before that inspection. After it passes, the system is backfilled and the ground is shaped so water runs off. On a new build, we can time this work with the foundation excavation and cistern installation.

Aerial view of new drainfield trenches with pipe laid on a wooded rural lot, septic system installation Concrete septic tank with green risers set in an open trench, septic system installation

Ready to get started?

Call or text for a written quote. We work about 100 miles around Reed Point across Stillwater, Sweet Grass, Yellowstone, Park, Gallatin and Carbon Counties.

(808) 561-7893
How We Work

How a Job With IP Construction Runs

From the first call or text to the finished work, here is how it goes.

1

Call or text

Call or text (808) 561-7893, or send the form. Tell us what the job is and where the land is.

2

We look at the job

We look at the ground and how the machines will reach the work. Show us any plans you have and any buried lines you know of.

3

Your free estimate

Your free estimate lists the work, in writing. When you say yes, the job goes on the schedule.

4

The work

We do the work the quote lists. On a new home, the site work and the foundation come first.

5

Finished work

Holes and trenches get backfilled, and the ground gets graded. Then we go over the finished job with you.

FAQ

Septic Systems Questions, Answered

Common questions about septic systems around Reed Point and the country between Billings and Bozeman. If yours is not here, call or text and ask.

Call (808) 561-7893

How much does septic system installation cost?
The system the design calls for sets much of the price. A sand mound or a pressure-dosed drainfield takes more parts and work than standard gravity trenches. Tank size, the length of the line runs, rock in the dig and the way in for equipment all count. We look at the approved plan and the site, then put a free estimate in writing.
What size septic tank does a house need?
Montana's septic standards size the tank by the number of bedrooms. One to three bedrooms need at least 1,000 gallons, and four or five bedrooms need 1,500. Six or seven bedrooms call for 2,000 gallons. The approved design sets the final size for your home.
How long does a septic permit take in Stillwater County?
Stillwater County asks for 7 to 14 days to process a septic application. The construction authorization can take up to 30 days. A lot still waiting on its DEQ approval adds a longer state step before that. The authorization runs 24 months, and the county may grant a 12-month extension if asked in time.
Do you design the septic system?
In Stillwater County, an authorized consultant designs the system, and it is approved before any digging. We install the system to that approved design. Stillwater County wants any change from the permit approved in writing first. In other counties, the county environmental health office says who may draw the plan.
Do you also pump or repair septic systems?
We install new septic systems, from the tank out to the drainfield. A septic pumper handles septic tank pumping, and a septic repair company handles problems with an older system.
What should I plan before the septic work starts?
Settle where the house and any well will go, since the septic layout works around both. In Stillwater County, a new pond or ditch must stay 50 feet from the tank and 100 from the drainfield. Point out private buried lines, like one to a shop, since 811 may not mark them.
More From IP Construction

Work That Pairs With Septic Systems

Deep basement excavation with stepped dirt sides and footing forms set at the bottom, foundation excavation

Foundation Excavation

We dig house and shop foundations to the dimensions and depths on your plans. After the concrete is in, we backfill against the walls.

Learn More
Crew guiding a blue plastic water tank as a mini excavator lifts it into place beside a lake, cistern installation

Cistern Installation

We install buried water cisterns for rural homes around Reed Point. We dig the hole so the top of the tank sits below the frost line, then backfill and cover it.

Learn More
Wood framed house with sheathed walls and a new metal roof on a concrete foundation, custom home building

Custom Home Building

We build complete new houses on your land, to your plans. Each build starts with the dirt work and runs through the foundation, framing, siding and roof.

Learn More
Why Choose IP Construction

Dirt Work and Home Building Between Billings and Bozeman

The dirt work and the house, one company

The septic system, the foundation, the driveway and the cistern can all come from IP Construction. So can the house.

Our own grader and bulldozer

We clear land with our own bulldozer and grade it with our own grader. A building pad gets shaped so water runs away from the house.

A free estimate in writing

We look at the job before we price it. The free estimate comes to you in writing.

Guides and Resources

Septic Systems Guides

Request a Quote

Get In Touch With IP Construction

Send the form with the job you have in mind and where the land is. You can also call or text (808) 561-7893 for a free estimate.

  • Call or text (808) 561-7893
  • Serving Reed Point, MT and the country between Billings and Bozeman
  • Free estimate in writing · excavation, septic systems and custom homes

Request a Quote

Tell us about the septic system, foundation, driveway or new home and where the property is. We look at the job and put a free estimate in writing.

Call (808) 561-7893