Foundation Excavation
We dig house and shop foundations to the dimensions and depths on your plans. After the concrete is in, we backfill against the walls.
Learn More
Septic system installation puts a new septic tank and drainfield in the ground where city sewer does not reach. We install new systems for homes and cabins on rural land between Billings and Bozeman. We have put in septic systems for homes around Reed Point.
A new septic system is often one part of a bigger build on bare land. We can plan it with the rest of a custom home build. As an excavation contractor serving Reed Point, we look at the site and put the quote in writing. Call or text (808) 561-7893 for a free estimate.
Tell us about the septic system, foundation, driveway or new home and where the property is. We look at the job and put a free estimate in writing.
Every new septic system starts with a site evaluation where the drainfield will go. NRCS soil surveys give a first look, but Montana's septic standards still call for a field check. A qualified site evaluator measures how much soil sits above groundwater or bedrock. The evaluation also looks at slope, flood risk, usable space and the setbacks.
Those findings shape the system. A standard drainfield uses trenches in the natural soil, fed by gravity or dosed under pressure. Where groundwater or bedrock sits close to the surface, the design may call for a raised sand mound. The state standards size a drainfield by the daily flow and the soil type.
The state standards also call for a replacement area, a second spot held for a future drainfield. Until it is needed, that ground has to stay usable for one.
Septic rules start with standards from the Montana Department of Environmental Quality (DEQ). County rules can be stricter, and the county environmental health office issues the septic permit. Sweet Grass County's application, for one, asks for nitrate results from a water sample.
Reed Point sits in Stillwater County, which wants a rural address assignment before a septic application. The lot also needs an approval statement on file. Under 20 acres, not counting county road frontage, that is a Certificate of Subdivision Approval from DEQ. Over 20 acres, the county issues a sanitary approval for a system an authorized consultant designs.
The county's technical rules shape the layout too. The septic tank sits 10 to 50 feet from the foundation unless an engineer's design or the county allows otherwise. No part of the system goes under a building or a driveway unless it is built for the load. Drainfields stay out of swales and low spots where runoff collects.
Digging waits for the county's go-ahead, a written construction authorization in Stillwater County. Buried utility lines get marked through Montana 811 first, with at least three business days of notice. The septic tank goes in per its maker's install guide, as Montana's septic standards require. The drainfield and the lines from the tank follow the approved plan.
The state standards call for at least 4 feet of cover over sewer lines, unless the designer justifies less. A line that cannot sit that deep gets insulation against freezing. Stillwater County makes septic system installers responsible for meeting every setback. If the site will not allow the design, the installer stops and calls the county.
A final inspection comes before the system is covered. Stillwater County can have a system uncovered if it was covered before that inspection. After it passes, the system is backfilled and the ground is shaped so water runs off. On a new build, we can time this work with the foundation excavation and cistern installation.
Call or text for a written quote. We work about 100 miles around Reed Point across Stillwater, Sweet Grass, Yellowstone, Park, Gallatin and Carbon Counties.
(808) 561-7893From the first call or text to the finished work, here is how it goes.
Call or text (808) 561-7893, or send the form. Tell us what the job is and where the land is.
We look at the ground and how the machines will reach the work. Show us any plans you have and any buried lines you know of.
Your free estimate lists the work, in writing. When you say yes, the job goes on the schedule.
We do the work the quote lists. On a new home, the site work and the foundation come first.
Holes and trenches get backfilled, and the ground gets graded. Then we go over the finished job with you.
Common questions about septic systems around Reed Point and the country between Billings and Bozeman. If yours is not here, call or text and ask.
We dig house and shop foundations to the dimensions and depths on your plans. After the concrete is in, we backfill against the walls.
Learn More
We install buried water cisterns for rural homes around Reed Point. We dig the hole so the top of the tank sits below the frost line, then backfill and cover it.
Learn More
We build complete new houses on your land, to your plans. Each build starts with the dirt work and runs through the foundation, framing, siding and roof.
Learn MoreThe septic system, the foundation, the driveway and the cistern can all come from IP Construction. So can the house.
We clear land with our own bulldozer and grade it with our own grader. A building pad gets shaped so water runs away from the house.
We look at the job before we price it. The free estimate comes to you in writing.

Septic tank installation cost in Montana: national cost guide ranges by system type, the state's tank sizes, county permit fees and what drives the price.
Read more →
Cistern vs well in Montana: cistern cost and well cost ranges, well depths near Reed Point, water cistern sizing, frost cover and who fills the tank.
Read more →
Cost to build a house in Montana: published per square foot ranges, plus what a rural lot adds for the driveway, septic system, water and power.
Read more →Send the form with the job you have in mind and where the land is. You can also call or text (808) 561-7893 for a free estimate.
Tell us about the septic system, foundation, driveway or new home and where the property is. We look at the job and put a free estimate in writing.