Excavation, septic systems and custom homes from Billings to BozemanExcavation and dirt work in Reed Point, MT
Call or text (808) 561-7893 Licensed, Insured and Bonded
IP Construction
Aerial view of a compact excavator in a freshly dug oval pond basin among trees, pond construction
Our Services

Pond Construction in Reed Point, MT

Pond Construction · Reed Point, MT

Ponds dug to suit the land and its water

Pond construction comes down to two things: soil that holds water and a source of water to fill it. IP Construction digs ponds for landowners around Reed Point, from Billings to Bozeman. A stock pond puts water out on the pasture where livestock graze.

Pond digging moves a lot of dirt, and it is part of our excavation work around Reed Point. If brush or trees cover the site, land clearing comes first, with our own bulldozer. We look at the ground and the water before we price the job. Call or text (808) 561-7893 for a free estimate in writing.

What We Handle

  • Ponds dug on rural land and acreage
  • Stock ponds for livestock water out on the pasture
  • Dug ponds fed by runoff or by groundwater
  • Pond sites cleared of brush and trees with our own bulldozer
  • Side slopes cut no steeper than the soil will stand
  • A gentle ramp at one end where stock can reach the water
  • Spoil spread and shaped to blend with the land around it
  • A free estimate in writing after we look at the site

Request a Pond Construction Quote

Tell us about the septic system, foundation, driveway or new home and where the property is. We look at the job and put a free estimate in writing.

Where Should a Pond Go on Your Land?

For stock water, the USDA pond handbook puts a pond in or near each pasture. Livestock should walk no more than a quarter mile to drink in rough, broken country. On smooth, nearly level ground, the handbook allows up to a mile.

A dug pond fills from runoff or from groundwater, and some ponds get both. A runoff pond needs enough land draining to it to hold water through a drought. Too big a drainage area calls for costly overflow work in large storms. Where runoff crosses a driveway on its way to the pond, a culvert under the road can carry it.

The handbook warns against a site crossed by buried pipelines or cables, or one under power lines. Montana law puts the call to Montana 811 on whoever does the digging. Private lines past the meter may not get marked, so point them out before the dig.

Pond Excavation and the Soil That Holds the Water

The USDA pond handbook rates clays and silty clays as excellent for holding water. Coarse sand and sand-gravel mixes let water through, it says, and are usually unsuitable. Ponds nearby in the same kind of soil are a good guide. A test hole filled with water hints at how fast a pond in that soil will seep.

The sides are cut no steeper than the soil will stand. For most ponds, the handbook puts that at 1:1 or flatter. A stock ramp should be 4:1 or flatter, which means 4 feet across for each foot down.

The dug dirt, called spoil, goes where its weight stays off the banks and rain cannot wash it back in. Spread and shaped with land grading, spoil can blend into the land around it. If spoil forms a low bank to hold more water, storm runoff needs a spillway around it, the handbook says.

Do You Need a Water Right for a Stock Pond in Montana?

The Montana Department of Natural Resources and Conservation (DNRC) says a water right is required to legally store water. Small stock ponds get a shortcut in state law. A livestock pit or reservoir can be dug right away, with no permit first, if it meets four tests.

It holds less than 15 acre-feet and uses less than 30 acre-feet a year. Its water does not come from a stream that flows all year. It sits on land of 40 acres or more that you own or control. Within 60 days after the pond is built, you file DNRC Form 605 for a provisional permit.

Ponds for other uses, and ponds fed by groundwater, have their own rules and forms. DNRC recommends a call to the regional office that serves your county. For Stillwater County, Sweet Grass County, Yellowstone County and Carbon County, that is the Billings office. Park County and Gallatin County go to the Bozeman office.

Excavator shaping a dry pond basin while a compactor rolls the bottom, pond construction Freshly dug pond basin with a compact track loader at the rim, pond construction

Ready to get started?

Call or text for a written quote. We work about 100 miles around Reed Point across Stillwater, Sweet Grass, Yellowstone, Park, Gallatin and Carbon Counties.

(808) 561-7893
How We Work

How a Job With IP Construction Runs

From the first call or text to the finished work, here is how it goes.

1

Call or text

Call or text (808) 561-7893, or send the form. Tell us what the job is and where the land is.

2

We look at the job

We look at the ground and how the machines will reach the work. Show us any plans you have and any buried lines you know of.

3

Your free estimate

Your free estimate lists the work, in writing. When you say yes, the job goes on the schedule.

4

The work

We do the work the quote lists. On a new home, the site work and the foundation come first.

5

Finished work

Holes and trenches get backfilled, and the ground gets graded. Then we go over the finished job with you.

FAQ

Pond Construction Questions, Answered

Common questions about pond construction around Reed Point and the country between Billings and Bozeman. If yours is not here, call or text and ask.

Call (808) 561-7893

How much does pond construction cost?
How much dirt moves sets most of the price, and that comes from the size and depth of the pond. A site that needs clearing first adds time, and so does tight access for the machines. Where the spoil goes counts too. We look at the site and put a free estimate in writing.
How deep should a stock pond be?
The USDA pond handbook maps a recommended minimum water depth by climate. It puts much of Montana in its semiarid band, at 10 to 12 feet. Go deeper where the pond must hold water all year, or where seepage tops 3 inches a month. The soil and the machine set how deep a dig can go.
Can a pond be fed by groundwater?
Yes, on flat or nearly flat ground, best where the water table sits within a few feet of the surface. The water-bearing layer must be within reach of the machine, and the handbook says that seldom tops 20 feet. Check test holes in a dry season, since a high water table can be temporary. Groundwater rules are tighter in some places, such as the Horse Creek Controlled Groundwater Area in Stillwater County.
Do I need a permit to dig a pond near a creek?
Changing the bed or banks of a year-round stream takes a 310 permit through the local conservation district. Fill placed in waters of the United States can need a 404 permit from the U.S. Army Corps of Engineers. A site in a designated flood hazard area can need a floodplain permit from the local floodplain administrator. The handbook puts permits on the pond owner, so ask these offices before the dig.
Do you dig ponds outside Reed Point?
Yes. Our service area reaches about 100 miles around Reed Point, from Billings to Bozeman. Big Timber, Columbus, Absarokee and Livingston are part of it, as are Greycliff and Fishtail. The full list is on our service areas page.
More From IP Construction

Work That Pairs With Pond Construction

Bulldozer pushing through a wooded lot in winter among bare trees and pines, land clearing

Land Clearing

We clear ground for a new house or a shop with our own bulldozer. Brush and small trees come out with their roots, and the site is ready to grade.

Learn More
Motor grader shaping a gravel road across open rural grassland with patches of snow, land grading

Land Grading

We grade building pads and yards with our own grader and bulldozer. Each one gets a slope that sends water away from the house.

Learn More
Excavator lowering a large corrugated metal culvert pipe into a trench across a forest road, culvert installation

Culverts

We set culverts under driveways and private roads so water passes under and the road stays put. Each pipe goes on a firm bed at the slope of the ditch.

Learn More
Why Choose IP Construction

Dirt Work and Home Building Between Billings and Bozeman

The dirt work and the house, one company

The septic system, the foundation, the driveway and the cistern can all come from IP Construction. So can the house.

Our own grader and bulldozer

We clear land with our own bulldozer and grade it with our own grader. A building pad gets shaped so water runs away from the house.

A free estimate in writing

We look at the job before we price it. The free estimate comes to you in writing.

Request a Quote

Get In Touch With IP Construction

Send the form with the job you have in mind and where the land is. You can also call or text (808) 561-7893 for a free estimate.

  • Call or text (808) 561-7893
  • Serving Reed Point, MT and the country between Billings and Bozeman
  • Free estimate in writing · excavation, septic systems and custom homes

Request a Quote

Tell us about the septic system, foundation, driveway or new home and where the property is. We look at the job and put a free estimate in writing.

Call (808) 561-7893